The Stormwater Performance Standard developed by an expert panel for the Chesapeake and Atlantic Coastal Trust is one of five stream restoration protocols. Within the FieldDoc system, Professionals can add this practice type to their project by searching either for the streambank restoration practice or the stormwater performance standard practice.
The FieldDoc team recommends selecting the streambank restoration practice if your project will include additional protocols. For work that will only involve a stormwater performance standard installation, you can select the individual practice type.
This article covers the input fields available to users if they select stormwater performance standard.
Find information on each streambank restoration protocol visit their respective articles
Protocol 1 - Prevented Sediment
Protocol 2 - Denitrification in the hyporheic zone
Protocol 3 - Floodplain reconnection
Protocol 4 - Stormwater performance standard
Protocol 5 - Outfall and gully stabilization
And read this article for steps and videos ons how to add your stream restoration practice to your project.
Inputs